Moestuin
2011-02-01, 20:44
Hey Guys,
Just thought I would post an update on how its going.
The house is coming along fine. After 3 months of ripping out mostly everything there was and installing new things ÂÂ*(completely new kitchen, cat 6 ethernet cables throughout the house all hidden in the wall to make a gigabit network between all the rooms. (I have a glass fiber connection setup for internet, HD tv, phone and radio)) this month is all about painting walls etc. and the 25th the new sliding French window made of glass (in NL: schuifpui) will be installed at the back garden side of the house, so the entire back wall needs to be broken out), after that we can lay the floor (laminaat) and we are planning to move there by March 2nd.
2 weeks after that we have our wedding, so perhaps ill see you all again some time after that.
Be well,
Moestuin
Just thought I would post an update on how its going.
The house is coming along fine. After 3 months of ripping out mostly everything there was and installing new things ÂÂ*(completely new kitchen, cat 6 ethernet cables throughout the house all hidden in the wall to make a gigabit network between all the rooms. (I have a glass fiber connection setup for internet, HD tv, phone and radio)) this month is all about painting walls etc. and the 25th the new sliding French window made of glass (in NL: schuifpui) will be installed at the back garden side of the house, so the entire back wall needs to be broken out), after that we can lay the floor (laminaat) and we are planning to move there by March 2nd.
2 weeks after that we have our wedding, so perhaps ill see you all again some time after that.
Be well,
Moestuin